Appendices¶
Appendix A Pilot Discovery Checklist¶
| Area | Questions |
|---|---|
| Asset | Technology, capacity, DUIDs, connection point, operating dates, OEMs and major configurations |
| Responsibilities | Owner, registered participant, trader, intermediary, OEM, O and M, NSP, site and control room; authority and handoff points |
| Data | SCADA, PPC or EMS, meters, weather, alarms, outages, bids, dispatch, constraints, prices and settlements |
| Contracts | PPA, O and M agreement, warranties, availability regime, curtailment rights and service agreements |
| Compliance | GPS, licence, market, testing, reporting, notice, recordkeeping and critical infrastructure obligations |
| O and M arrangement | Contract scope, site coverage, planned and corrective work, reporting, warranties, response times and escalation |
| Performance | Owner and O and M KPIs, targets, loss methods, disputes, recurring events and reporting cycle |
| Decisions | Who can rebid, curtail, derate, reset, change settings, approve work and notify stakeholders |
| Value | Material losses, upcoming decisions, risk appetite and success criteria |
Appendix B Minimum Performance Data Model¶
| Entity | Minimum fields |
|---|---|
| Asset | Asset ID, DUID, technology, capacity, location, connection point and ownership |
| Interval | Trading interval, target, actual, availability, bid bands, RRP, local price indicators and constraints |
| Equipment | Equipment ID, state, capability, alarms, derating and controller status |
| Event | Start, end, category, cause, response, evidence, impact, owner and recurrence link |
| Obligation | Source, requirement, owner, frequency, evidence, status, due date and escalation |
| Maintenance | Work scope, equipment, access, duration, resource risk, market exposure and completion |
| Contract | Relevant operational rule, trigger, limitation, evidence and responsible reviewer |
| Model | Version, inputs, assumptions, constraints, objective, tests, approval and performance |
Appendix C KPI Definitions to Agree¶
| KPI | Definition question |
|---|---|
| Technical availability | What equipment boundary, time basis, exclusions and partial capability rules apply? |
| Operational availability | Was the asset operationally ready, including people, communications and supporting systems? |
| Bid availability | What capability was offered to the market and why did it differ from physical capability? |
| Dispatch conformance | What tolerance, persistence and event exclusions apply? |
| Lost energy | What baseline would have occurred without the event, and how is uncertainty represented? |
| Lost revenue | Which price, MLF, contract, certificate and settlement assumptions apply? |
| Forecast accuracy | Which horizon, aggregation, metric and operating states are included? |
| Recurrence | When are events considered the same failure mode or unresolved corrective action? |
Appendix D Proposal Customisation Checklist¶
Replace generic client references with the legal entity and nominated business unit.
Select one asset and confirm the registered participant and operating counterparties.
Insert the specific problem statement from discovery.
Confirm the sample period, data sources and data security requirements.
Choose only the workstreams required for the initial decision.
Insert delivery dates, fee, payment terms, liability settings and insurance information.
Have confidentiality, intellectual property and regulatory wording reviewed appropriately.
Nominate acceptance criteria and authorised signatories.
Appendix E Future Book Development¶
This handbook should evolve as individual services become real products. Each service chapter should eventually include a problem statement, required data, method, controls, sample deliverable, commercial model, competence requirements, case study and lessons learned. New material should be added only after it can be explained, demonstrated and delivered consistently.
| Next chapter to develop | Suggested practical case |
|---|---|
| Availability reconciliation | Rebuild an owner and OEM reconciliation using a representative wind farm event set |
| Generator compliance tracker | Create an off-target event workflow from detection through investigation and recurrence |
| Maintenance optimisation | Select a heavy-component wind-farm maintenance window under wind and price uncertainty |
| BESS optimisation | Schedule energy and FCAS with SOC between 3 percent and 97 percent and degradation constraints |
| Hybrid portfolio optimisation | Coordinate wind, solar and BESS under export, PPA and market constraints |
| Contractual curtailment | Evaluate an offtaker request to reduce output across upcoming dispatch intervals |
Document Use¶
Part One may be customised for prospective clients after discovery with the owner and relevant O and M representatives. Part Two is an internal development roadmap. Neither part authorises operational control, replaces the O and M contractor, or replaces legal, regulatory, financial, engineering-certification or registered participant advice.